Skip to content | Change text size
Annual Report 1999
 

16 Purchasing and Services Unit

Most of the Unit's procedures and workflows were revised with the introduction of SAP R/3 Integrated Administrative System to the University. This has streamlined activities and provides extensive reporting and management options.

The Hargrave-Andrew Library was the focus of building works throughout 1999, with a multi-storey extension and the refurbishment of many areas of the original building. The building upgrade has allowed the merging of the staff and collections of the original Hargrave and Biomedical Libraries. It has created a modern atmosphere for staff and students and has improved access to service and collections through the efficient use of space.

OH&S activities included the investigation of Reference and Loans desk designs and training in PC ergonomics following the introduction of Voyager, which is a "mouse" driven system.

Ask a question Phone +61 3 9905 5054 or use our enquiry services ask.monash for Monash students and staff | ask.monash for visitors and alumni.
Your opinion Feedback form for Monash staff and students | Feedback form for visitors and alumni